DLW had some points to burn and we needed a ladder. Result = Little Giant 1A with work platform. All I have to say is that I am now a believer. This ladder albeit heavy as fully grown sheep, is one of the best working tools I own.

Pictured below is 1 piece of drywall I hung on Sat thanks to Ed and Chad. I can not believe how heavy green board is. It’s a mold and water resistant surface for walls. You have to use this around water in a room. Also pictured was the cut and install of the vent ductwork and wall cap. I used vent HVAC tape, the metal stuff not duct tape. They are not the same thing. Actually duct tape is not for heating and cooling. Google it. I was really stoked about the way I secured the vent to the joists– electrical wire zip ties. It was so cold for me to caulk and install the screws on the wall cap, so I am saving for another day. Slightly warmer than 24 F deg!

First wall board


The ladder Wrapping the wall cap with vent tape, not duct tape. Yep cold.


Run of the duct Close up of zip ties Yes I insulated, you will make noise I do not want to hear.