Well I have to say that I am exhausted. I finally completed all my demolition work. I was able to remove the ceiling in 2 days and organize all the garbage for pick up. I still need to haul it all off to the dump on Saturday.

Wednesday night I blocked off the leaky joist channels with pressure treated lumber to keep the wasps out. This was the reason for tearing up the kitchen. It was remodeled incorrectly and there seemed to be many problems with up to 4″ holes to the outside. Not too much water damage, but the wood is really dark in many spots. Check out the recessed lighting I installed.

134-60.jpg 134-61.jpg 134-62.jpg


134-63.jpg 134-64.jpg 134-65.jpg


134-66.jpg 134-67.jpg 134-68.jpg


134-69.jpg 134-70.jpg 134-71.jpg


134-72.jpg